Au' Authum Ki

Your general contracting, design build, and construction management services partner

  • About
  • Services
  • Projects
  • Estimating & Forms
  • Contact Us

Hill AFB Building 570 Renovation/Addition, 75th Medical Group Phase I

Federal Projects

Hill AFB Building 570 Renovation/Addition, 75th Medical Group Phase I

AAK Corrected logo with text-TRANSPARENT

This design/build project consisted of a renovation and addition to the Main Medical Treatment Facility at Hill AFB.

Our Team moved approximately 116 GSF of vestibule from its existing location inside the Airmans’ Annex lobby and placed it directly adjacent to its former location to the exterior of the building, allowing for better flow within the clinical space.  The project relocated the optometry clinic from the Armain’s clinical area to the main outpatient clinic so that it could be better utilized by the entire base population, this allow for the addition of four exam rooms and one procedure room dedicated to supporting the active duty population  Project highlights include:  A phasing plan resulting in more than 10 individual phases of work to allow the facility to operate at full capacity and to not have to reduce any patient services during construction; planned, coordinated and carried out all aspects of the Air Forces Initial Outfitting and Transitioning Services.


Back To Projects

Hill AFB Building 570 Renovation Addition, 75th Medical Group Phase I

  • Project Value: $2,137,925
  • Project Location: Hill AFB, UT
  • Owner at Time of Project: U.S. Army Corps of Engineers

More Federal Projects


Ft. Hood WIT Complex

Ft. Hood Warrior in Transition Complex


Hill AFB Bldg 570 Phase II

Hill AFB Building 570 Renovation-Addition, 75th Medical Group Phase II


Columbia Basin Dormitory

Columbia-Basin-Civilian-Conservation-Center-Dormitory-1-1024x683


Ft. Knox WIT Complex

Ft


Ft. Hood Dining Facility

Ft. Hood Dining Facility


White Sands Dining Facility

White Sands Missile Range Dining Facility


Alchesay Barrack Bldg 3112

Alchesay Barrack Renovation, Building 3112


Ft. Bliss Dining Facility

Ft Bliss Dining Facility


358th Squad Op Bldg

Repair & Addition – 358th Squadron Operation Building

Copyright © 2025 · Au' Authum Ki · All Rights Reserved