Hill AFB Building 570 Renovation/Addition, 75th Medical Group Phase I
This design/build project consisted of a renovation and addition to the Main Medical Treatment Facility at Hill AFB.
Our Team moved approximately 116 GSF of vestibule from its existing location inside the Airmans’ Annex lobby and placed it directly adjacent to its former location to the exterior of the building, allowing for better flow within the clinical space. The project relocated the optometry clinic from the Armain’s clinical area to the main outpatient clinic so that it could be better utilized by the entire base population, this allow for the addition of four exam rooms and one procedure room dedicated to supporting the active duty population Project highlights include: A phasing plan resulting in more than 10 individual phases of work to allow the facility to operate at full capacity and to not have to reduce any patient services during construction; planned, coordinated and carried out all aspects of the Air Forces Initial Outfitting and Transitioning Services.
- Project Value: $2,137,925
- Project Location: Hill AFB, UT
- Owner at Time of Project: U.S. Army Corps of Engineers
More Healthcare Projects
Phoenix VA Renovation
Hill AFB Bldg 570 Phase II
Phoenix VA Mental Health
Patrick AFB Vet Clinic
Hill AFB Vet Clinic
Ventana Professional Medical Complex
Komatke EMS