Federal Projects
White Sands Missile Range Dining Facility

This design/build project consists of new construction of a 19,356 SF dining facility.
The facility has a functional layout with consideration given to daily operations in the kitchen area, at the public entrance, in the food service area, at check-out in the seating areas and at exiting. The layout is effective for the flow of 800 diners to be served within a 90-minute period, 3 times per day, 365 days per year. Project highlights include: Utilization of Building Information Modeling; Designed and constructed to LEED Silver certifiable standards; and in accordance with AT/FP requirements.
- Project Value: $8,000,089
- Project Location: White Sands Missile Range, NM
- Owner at Time of Project: U.S. Army Corps of Engineers
More Federal Projects
Ft. Hood WIT Complex

Hill AFB Bldg 570 Phase II

Columbia Basin Dormitory

Ft. Knox WIT Complex

Ft. Hood Dining Facility

Ft. Bliss Dining Facility

Alchesay Barrack Bldg 3112

Hill AFB Bldg 570 Phase I

358th Squad Op Bldg

